Visit this web page to stay informed of system outages and maintenance that occurs in the College. This information is also posted to the cc-tso-availability@lists.gatech.edu mailing list, which you can join on the OIT SYMPA server. An outage is an unplanned system or service interruption and a maintenance event is planned system downtime of a system or service. Please feel free to contact the TSO Help Desk (404-894-7065, helpdesk@cc.gatech.edu) if you have any questions.
- How do I Subscribe to TSO System Notices?
- Or, click on the RSS icon above to view our feed. Save the link to your favorite RSS reader.
- Where can I find information about OIT System Notices?
Type of Notice | Title | Description | Date Sort ascending |
---|---|---|---|
Outage | Partial Web Services Outage | The web database server and a few other virtual machines went offline. | |
Maintenance | ic.gatech.edu Website Update - 7/24/23 | The ic.gatech.edu website will be updated from Drupal 7 to Drupal 9 and moved to a new VM server. | |
Maintenance | crnch.gatech.edu Website Update - 7/07/23 | The new CRNCH site will go live July 7th between 10:00am and 12:00pm. | |
Maintenance | Windows Server Maintenance | All Windows-based server routine patching and maintenance | |
Outage | TSO Virtual Machine Environment Outage - 7/3/2023 | At 7:12AM on Monday, July 3rd, TSO discovered the virtual machine environment hosting instruction, research, and infrastructure virtual machines was having network issues and is currently in an unstable state. Many services are affected including cc.gatech.edu and several other websites, as well as instructional and research VMs. | |
Maintenance | College Website Update - 6/29/23 | Google Analytics tracking code will be added to the College site for the Google Analytics 4 upgrade. | |
Maintenance | Klaus Wireless Equipment Upgrade | OIT will upgrade the existing wireless equipment throughout the Klaus Advanced Computing Building | |
Outage | Web Database Server Outage | The web database VM server had a storage issue and went into a paused state. | |
Maintenance | killerbee Migration | TSO will migrate the killerbee cluster from the existing blend of physical and virtual servers to two virtual servers | |
Maintenance | cse.gatech.edu Website Update - 6/26/23 | The cse.gatech.edu website will be updated from Drupal 7 to Drupal 9 and moved to a new VM server. | |
Outage | Brief power outage in TSRB data center | Some research servers in the TSRB data center were offline. | |
Maintenance | Drupal Websites Module Update - 6/15/23 | The Google Analytics module will be updated on the Drupal websites to prepare for the Google Analytics 4 upgrade. | |
Maintenance | Windows Server Maintenance | All Windows-based server routine patching and maintenance | |
Maintenance | DNS Cleanup | Removing old entries in excess of 2 years from IPAM | |
Maintenance | Firewall and switch software upgrades | OIT will upgrade the software on firewalls and Cisco Catalyst 4506/4510 switches across campus | |
Maintenance | arc.gatech.edu update | arc.gatech.edu will be updated to fix an XML date issue | |
Maintenance | killerbee3 being turned off | TSO will turn off killerbee3 to clone the VM for testing upgrades to the killerbee cluster. | |
Maintenance | Windows Server Maintenance | All Windows-based server routine patching and maintenance | |
Outage | Some Drupal Website Outage - 3/31/23 | Some College of Computing and School sites were inaccessible. | |
Maintenance | KACB first floor mopier relocation | The mopier located on the first floor of KACB has been relocated to the KACB 1329 recycling area | |
Maintenance | Drupal Websites Scheduled Maintenance - 3/29/23 | Drupal websites will be patched to apply the fix for a security vulnerability. | |
Maintenance | cc.gatech.edu Update - 3/28/23 | A Drupal module will be added to the main College website. | |
Maintenance | Drupal Websites Scheduled Maintenance - 3/28/23 | Drupal websites will be patched to apply the fix for a security vulnerability. | |
Maintenance | flamel.gatech.edu to be decommissioned | TSO will decommission the site flamel.gatech.edu for the Comms group | |
Maintenance | KACB data center UPS replacement completion | Schneider Electric (APC) will complete the replacement of the old UPS system located in the TSO data center located in KACB 2219. |